AnsweredAssumed Answered

two subprocesses inside bpmn model does not work

Question asked by cvspanje on Dec 7, 2010
Hi I have one bpmn model with two embedded subprocesses.
When I edit the first at a second level all goes well. But if I want to model the second sub proces, activity thinks I am modelling the first one.
Result is that when I alter the second, I automatically alter the first ending up with nothing.

When I try to reference them with the properties bar I get a xmlparse error:

XML-parsefout: niet-overeenkomende tag. Verwacht: </meta>.
Locatie: http://localhost:8080/activiti-modeler/p/Uitnodigen%20leveranciers
Regelnummer 30, kolom 4:

Tips?
regards
cvspanje

Outcomes