Latest reply on Sep 27, 2011 by trademak
What is the best way to model looping back to a previous activity?  I found some online examples showing the sequence back to a previous activity originating from a intermediate event (none).  The Designer version I have (5.7.1) doesn't feature the none type intermediate event.

I have a simple test to determine whether the flow loops back or moves forward.

Thanks.