AnsweredAssumed Answered

2 connections between task nodes possible

Question asked by steve1 on May 24, 2012
Latest reply on May 30, 2012 by steve1
Hi,

This is my fault, but 2 connections between task nodes are possible, and I can't know if this task has two connections because the graphic shows only one connection, and no error indication.

If I run this process in engine, two same task is executed.

In case of the start node, it shows error indication if it has two connections.

I tested with user task and service task, and 2 concurrent path is possible between these tasks.

I attached diagram and unit test.

Should I file a jira issue for this?

Thanks.

Attachments

Outcomes